The Blanchardstown to City Centre Core Bus Corridor Scheme (the Proposed Scheme) will support integrated sustainable transport usage through infrastructure improvements for active travel (both walking and cycling), and the provision of enhanced bus priority measures for existing (both public and private) and all future services who will use the corridor. It commences at Junction 3 (Blanchardstown / Mulhuddart) southbound off-slip from the N3 and proceeds along the R121 Blanchardstown Road South into the Blanchardstown Shopping Centre. From a new terminus to the north-west of Blanchardstown Shopping Centre, the Scheme is routed onto the N3 Navan Road via the Snugborough Road junction and follows the N3 and Navan Road as far as the junction with the Old Cabra Road, then routed along the Old Cabra Road, Prussia Street, Manor Street and Stoneybatter to the junction with King Street North. The Core Bus Corridor is then routed via Blackhall Place as far as the junction with Ellis Quay. At the Stoneybatter / Brunswick Street North junction, cyclists are routed along Brunswick Street North, George’s Lane and Queen Street as far as the junction with Ellis Quay / Arran Quay.

The aim of the Proposed Scheme is to provide improved walking, cycling and bus infrastructure on this key access corridor in the Dublin region, which will enable and deliver efficient, safe, and integrated sustainable transport movement along the corridor. The Proposed Scheme is a key measure that delivers on commitments within the National Development Plan (2021-2030), the Transport Strategy for the Greater Dublin Area (2016-2035) the Climate Action Plan (2021) and the National Planning Framework 2040.

Map

Planning Documentation

Volume 3 - Figures: Part 3 of 3

Chapter 5 Construction

Chapter 6 Traffic and Transport

Chapter 7 Air Quality

Chapter 9 Noise and Vibration

Chapter 10 Population

Chapter 11 Human Health

Chapter 12 Biodiversity

Chapter 13 Water

Chapter 14 Land, Soils, Geology and Hydrogeology

Chapter 15 Archaeology & Cultural Heritage

Chapter 16 Architectural Heritage

Chapter 17 Landscape & Visual

Chapter 18 Waste & Resources

Chapter 21 Cumulative Impacts

Location Maps

Preliminary Design Report

Preliminary Design Report Appendices

Notifications

There are no notifications at present.